Route

The international line is 52 km long, crosses 2 countries via 83 bridges and passes through 31 tunnels. A spectacular journey between Switzerland and Italy to be discovered at www.vigezzinacentovalli.com

    Banner image

    Frequency

    Regional trains connect Locarno and Camedo every hour.

    Banner image

    Work in progress

    24.09.2026

    Centovalli Railway: Night works along the railway line

    In order to ensure safe, reliable and punctual rail operations in the future, various night works will be carried out along the Centovalli Railway from 04.10.2026 to 23.12.2026, generally between 8:00 pm and 5:00 am.

    From Sunday 04.10 to Saturday 28.11.2026 (San Martino – Ponte Brolla section and Sabbioni area, Cavigliano)

    • Renewal of the railway infrastructure, including the unloading and distribution of ballast using railway maintenance vehicles.
    • Overhead contact line works at Ponte Brolla station, including the installation of new poles and the transfer of the overhead line to the new infrastructure.
    • Stabilization and maintenance works on the rock face adjacent to platform 2 at Ponte Brolla station.
    • Removal of the construction crane during two dedicated nights.

    From Monday 12.10 until mid-December 2026 (Ponte Brolla – Intragna section)

    • Track maintenance works, including the targeted replacement of worn rails and the transport of railway materials along the affected section.

    From Thursday 17.12 to Wednesday 23.12.2026 (San Martino – Intragna section)

    • Rail grinding works using a bimodal maintenance vehicle and related movements to and from the work sites.

    Some activities will require the use of railway machinery and construction equipment during nighttime hours and may generate temporary noise emissions. All reasonably practicable measures will be taken to minimize disturbance.

    The work schedule may be modified due to weather conditions or operational requirements. We apologize for any inconvenience and thank the population for their understanding.


    19.10.2025

    Vigezzina-Centovalli Railway: closure of the waiting room – Verdasio Station
    FART informs its valued passengers that, from Monday 20 October 2025 (after the last train on Sunday 19 October), the waiting room at Verdasio Station will not be accessible to the public.

    The closure is necessary for the renewal of the safety system. With the upcoming adaptation of the station to the Disability Act (project pending approval), new waiting shelters will be installed.


    19.05.2025
    Vigezzina-Centovalli Railway: work to adapt stations to the LDis (Disabled Persons Act)
    The FARTs informs the respectable users that as part of the work to adapt the stations to the Disabled Persons Act (LDis):

    • The Ponte Brolla train station is closed to the public until further notice. The station is served by Line 315 of the FART Autolinee. More information

    Bicycle transport

    Bicycle transport is permitted on all routes from Monday to Friday, from 08.00 to 16.00 and from 19.00 to 06.00. Saturdays, Sundays and public holidays without time restrictions.

    The Disabled Persons Act (LDis) stipulates that from 2024, public transport must be accessible without barriers and thus, in principle, independent use by persons with disabilities. In recent years, various equipment and vehicles have been adapted to enable disabled users and users with reduced mobility to travel independently.

    Contact for disabled travellers
    Disabled travellers are invited to contact the Swiss Central Office, SBB Handicap Contact Centre:

    • From Switzerland: Tel. 0800 007 102, free of charge (service available from 06.00 to 22.30)
    • From abroad: Tel. +41 800 007 102

    Nodes
    of interchange

    Interchange nodes are points where several bus lines converge or where there is also a railway stop, offering the possibility of changing means of transport. The interchange nodes between regional railway trains and bus lines are at the stations of S. Antonio (e.g. Line 7 and 315), Solduno (e.g. Line 314 and 315), Ponte Brolla (Line 315) and Intragna (Line 324).

    Discover the other lines